- Home
- Government
- Departments
- Electric Department
- Retail Electric Rates
Retail Electric Rates
Effective June 1, 2023
Residential Rate: Schedule "RS"
Description | Billing Rate |
---|---|
Customer Charge | $10.00 |
First 800 kilowatt hour (KWH) | $0.10277 |
All Additional | $0.09791 |
General Power Rate: Schedule "GSA"
Description | Billing Rate |
---|---|
GSA-1 (0 - 50 kilowatt (KW) and 0 - 15,000 KWH) Class 40 | N/A |
Customer Charge | $20.00 |
All KWH | $0.11244 |
GSA-2 (51 - 1,000 KWD or 15,000 KWH) Class 50 | N/A |
Customer Charge | $50.00 |
First 15,000 KWH | $0.11306 |
Additional KWH | $0.06631 |
0-50 KW Demand | $0.00 |
51 - 1,000 KW Demand | $13.83 |
GSA-3 (1,001 - 5,000 KWD) Class 54 and 55 | N/A |
Customer Charge | $100.00 |
All KWH | $0.07039 |
0 - 1,000 KW Demand | $12.71 |
1,001 - 5,000 KW Demand | $12.69 |
TOU Service GSB
Description | Billing Rate |
---|---|
Customer Charge | $1,500.00 |
Demand Charge | N/A |
On Peak | $10.87 |
Maximum | $5.21 |
Excess Over Contract | $10.87 |
Energy Charge | N/A |
On Peak | $0.08891 |
Off Peak First 200 Hours | $0.06400 |
Off Peak Next 200 Hours | $0.02942 |
Off Peak Additional KWH |
$0.02601 |
TOU Service MSB
Description |
Billing Rate |
---|---|
Customer Charge | $1,500.00 |
Demand Charge | N/A |
On Peak | $10.24 |
Maximum | $2.26 |
Excess Over Contract | $10.24 |
Energy Charge | N/A |
On Peak | $0.08139 |
Off Peak First 200 Hours | $0.05639 |
Off Peak Next 200 Hours | $0.02670 |
Off Peak Additional KWH | $0.02415 |
Part A - Charges for Street & Park Lighting, Traffic Signals & Athletic Field Lighting
Description |
Charge |
---|---|
E197 and E199 Customer Charge |
$2.50 |
E197 and E199 Energy Charge | $0.07063 |
E198 Customer Charge |
$0.00 |
E198 Energy Charge | $0.07063 |
Part B - Charges for Outdoor Lighting for Individual Customers
Type |
KWH |
FAC Rental |
Energy |
Total |
---|---|---|---|---|
100 WHPS |
42 |
5.13 |
2.97 |
8.10 |
129 LED-FLOOD | 49 |
14.07 |
3.46 |
17.53 |
250 LED-VERD |
50 |
9.34 |
3.53 |
12.87 |
252 LED-FLOOD |
93 |
17.15 |
6.57 |
23.72 |
250 WHPS |
105 |
7.10 |
7.42 |
14.52 |
250 WHPS - Flood |
105 |
11.09 |
7.42 |
18.51 |
400 WHPS |
165 |
7.10 |
11.65 |
18.75 |
400 WHPS - Flood | 165 |
11.09 |
11.65 |
22.74 |
175 WMV | 70 |
4.21 |
4.94 |
9.15 |
400 WMV | 155 |
5.49 |
10.95 |
16.44 |
250 WMHD | 105 |
7.74 |
7.42 |
15.16 |
350 WMHD - Flood | 140 |
8.14 |
9.89 |
18.03 |
350 WMHD - Shoe | 140 |
9.84 |
9.89 |
19.73 |
400 WMHD | 165 |
7.78 |
11.65 |
19.43 |
1000 WMHD | 398 |
9.42 |
28.11 |
37.53 |
LED 50 Caretaker | 18 |
7.85 |
1.27 |
9.12 |
LED 75 Caretaker | 27 |
6.16 |
1.91 |
8.07 |
LED Type 5 Shoe | 82 |
16.89 |
5.79 |
22.68 |
Rental Charges
- 35 foot Wood Pole Rental Charge: $5.89 per month
- 40 foot Wood Pole Rental Charge: $8.87 per month
Special Poles
Customer may request C.E.D. to set a Special Pole (i.e. Fiberglass, Steel, Decorative). In this case, the Customer will be charged for the cost difference between a wood pole and the special pole requested. This is based on most current cost of specified pole. Please call for questions and pricing.
Billing Demands
Billing Demand = The greater of:
- The Highest 30 Min. Interval KW During the Billing Period
- 85% of the Highest KVA Interval
- 30% of the Contract Demand
- 30% of the Highest Billed Demand in the Preceding 12 Months
Contract Demands
- Minimum Bill (51kw - 1000kw): Contract Demand (CD) X (20% X 51-1,000 KW Rate) + Customer Charge
CD X (0.2 X $13.83) + $50 - Minimum Bill (1001kw - 5000kw): Contract Demand (CD) X (20% X 1,001-5,000 KW Rate) + Customer Charge
CD X (0.2 X $12.69) + $100 - Minimum Bill (5000kw - 15,000kw): Contract Demand (CD) X (30% X 5,000-15,000 KW Rate) + Customer Charge
CD X (0.3 X $15.40) + $1,500
In the event that any bill is not paid by the net due date, there shall be added to the bill an amount equal to 5%.